External Wall Insulation Nottinghamshire
Read an EWI quotation line by line
Understand the assumptions, allowances and associated work behind the total.

The starting point for an EWI price is a defined construction proposal. Ask each bidder to identify the walls included, the selected assembly and the conditions assumed at the property. Then check the items surrounding the installation. Survey work, existing defects, roof alterations and specialist return visits can change the scope even where two quotations show the same wall area.
Find out what has actually been assessed
Look for a description of the existing building and the information used to prepare the quotation. Which elevations were inspected, and what remains concealed? Ask whether the price assumes that existing coatings remain or that they will be removed. If testing or opening up is required, agree the purpose, extent and authorisation separately so you know what the next stage will establish.
The preparation allowance needs more than a general phrase such as making good. Ask which defects are included and how any additional repair will be identified and priced. Keep an elevation reference for the work wherever possible. A decision reached after investigation should lead to an updated scope, with the affected quantities and programme made clear.
Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Entry | Check before comparing prices |
|---|---|
| Survey or design fee | What work and documents does it cover? |
| Preparation allowance | Which condition and repair extent are assumed? |
| Installation | Does it identify the complete assembly and included elevations? |
| Other trades | Who orders, pays for and checks their work? |
| Access | Does its duration cover the planned inspections and return visits? |
| Variations | How is changed work described and authorised? |
Check the system and the extent together
A product schedule should make the insulation, fixings, basecoat and finish identifiable. Obtain the documentation appropriate to the proposed assembly and building. The named-system certificates illustrate why a component is assessed within a particular construction; they do not establish that an unrecorded combination is interchangeable with it. Ask who confirms the final specification and current supporting evidence.
Mark the included faces on drawings, with small returns and work above lower roofs shown explicitly. If a front wall is retained, include the treatment at the new system’s ends. If a second phase is expected, identify what the first quotation completes and what remains for that later contract. This prevents a reasonable-looking area measurement from leaving important junction work unpriced.

Allocate the jobs around the main installation
Make a separate list for windows, sills, roof edges, gutters, pipes, cables and fittings. Beside each item, write who designs it and who undertakes the alteration. Where a utility or specialist trade is involved, confirm the necessary appointment and information before relying on the main installer’s start date. A general promise to work around equipment does not describe its final connection.
Ask the proposal to show the finished wall’s relationship with the roof and openings. INCA’s weathering guidance treats these as assessed interfaces, with the existing condition informing the detail. If a quotation depends on another contractor altering an edge first, include that dependency in your cost and programme comparison. Agree the temporary arrangements as well as the completed result.

Agree how the total can change
Separate client choices from findings that require a revised design. Choosing a different finish is one type of variation; discovering unexpected construction during an agreed investigation is another. Ask for the proposed change, reason, cost and timing to be recorded before instructing it. Keep the latest drawings and accepted quotation together so that everyone is working from the same scope.
Check the payment stages and the documents expected at each stage in the actual contract. Identify the contracting business and any warranty terms offered for that proposal. Before access is removed, arrange the inspections and resolution of outstanding items. Finish with the system identity, approved alterations and care instructions needed for future work on the house.
Questions and answers
What should I do when two quotations include different systems?
Ask the designers or bidders to explain the differences against the same property brief. Compare the included work, supporting evidence and junction arrangements before treating the totals as alternatives for an identical job.
Can I ask for a separate price for each elevation?
Yes. Ask for the shared costs and the treatment between phases to be explained as well. A phased proposal should describe how each stage is completed and what the later work will need to connect to.
Sources and further reading