Insulated side and rear walls with a deliberate junction at the front.

External wall insulation can be considered for selected elevations of a Carlton house as well as a whole exterior. When the front is staying in brick, the side-wall insulation needs a designed edge that works with that retained face. The proposal must deal with the roof, openings and thermal junctions as well as the appearance of the return. Painting the two surfaces a similar colour would not resolve those connections.
A Carlton proposal makes the retained-front question concrete
Gedling’s 2026 application record 2026/0549 describes side and rear insulation and rendering to a Carlton dwelling, together with extending roof verges and eaves. It also describes retaining the front façade and extending brickwork and ornamental detailing to conceal and protect the edge of the gable insulation. These are the recorded proposals.
For another house, the useful starting point is the same distinction between the surfaces being insulated and the features being kept. Identify the visible brick, any projecting detail and the point where the new system would stop. The actual solution must suit that house; a detail described in a neighbouring application is not a ready-made instruction for its installation.
Partial coverage changes the design at the boundary
The designer needs to assess the meeting of insulated and untreated walls, including its thermal and moisture implications. The outer edge must also resist water entry and have a finish that can be inspected and maintained. This can affect how far the system returns and which adjoining features need alteration. Resolve those decisions before choosing a stop line merely because it is easy to hide.
Compare the alternatives on a drawing showing both faces together. A front elevation sketch alone can conceal the projection of a thickened side wall. A side view alone can miss a decorative feature that should remain legible from the street. Include close-up sections where the proposed edge meets brickwork, a sill or an existing roof. These details let the quotation price a defined outcome.
Show any alternative layout alongside the original proposal, with the same viewpoints and boundaries. For example, a shorter insulated return and a changed brick edge are not equivalent simply because both leave the front mostly visible. The comparison should identify the construction implications, any approval change and the items added or removed from the price. The owner can then choose between defined proposals rather than two descriptions of a similar appearance.

Scroll sideways to see the full table. Keyboard: focus the table, then use the arrow keys.
| Part of the house | What needs resolving | Useful evidence |
|---|---|---|
| Brick front and side return | Extent and form of the termination | Both elevations and a junction section |
| Ornamental feature | What remains exposed and how edges meet it | Measured feature and proposed detail |
| Gable top | Protection above the added wall depth | Roof/verge specification |
| First window on the side | Reveal and sill relationship to the stop | Window position and dimensions |
Design the roof work with the wall edge
Where the insulation extends the outer face beyond the protection of the existing roof, its top requires a considered solution. Roof extension and a designed closure have different construction and maintenance implications. Establish who specifies the selected arrangement and whether a roofer or another trade is included. The wall installer should receive a usable detail before reaching that stage.
Gutters and downpipes may also need repositioning. Their final route should work with the new face and the existing drainage connection, while allowing future access to fittings. If a pipe sits beside the retained-front junction, draw both together. It is much easier to compare that arrangement before procurement than after a finished return has narrowed the space available.

The existing wall still needs a complete assessment
Keeping the front untreated does not remove the need to investigate the walls receiving insulation. The survey should establish their construction, condition and existing coatings. Damp marks, loose finishes or previous patches may require separate investigations or repairs. The proposed system must be specified for that background rather than selected solely because its finish resembles a nearby house.
Where the installation needs drilling or removal into suspect materials, the asbestos survey scope must address that disturbance. The attachment design and preparation should then follow the assessed wall. Agree an inspection stage if stripping exposes a condition that could change the proposal. This gives the contractor a defined route for reporting a discovery instead of concealing it beneath the next layer.
Choose the colour after the boundaries are settled
View the finish sample alongside the retained brick and any proposed edge materials. Consider the complete elevation, including the width of the return and the visible sill projections. A darker sample may need a different product-specific review from a pale finish, so check the permitted options for the chosen system before confirming the colour.
The final quotation should identify the insulated elevations, retained areas, junction details, preparation, access and associated roof or service work. Check the current planning and building-control position for that actual proposal. Keep the agreed drawings and any approved variations with the handover information. For a Carlton enquiry, call 01623 579297 with the surfaces you want to retain and the areas where insulation is being considered.
Questions and answers
Can the brick front stay while the side is insulated?
It may be possible with a suitable partial-elevation design. The retained front, the edge of the insulation and the adjoining thermal and weathering details need assessment together. Any planning or heritage requirements also depend on the particular property.
Can the new side finish meet the front without a visible change in depth?
That depends on the construction and the chosen edge detail. The insulation adds depth, so the design should show its projection honestly. Resolve how it meets the retained feature rather than assuming the final coating will conceal the difference.
Local context
Application 2026/0549 in Carlton proposes insulation and rendering to the side and rear, together with extensions to roof verges and eaves.
Gedling Borough Council — Burton Road, CarltonEvidence period: 2026 application record; checked 23 November 2026Source checked: 23 November 2026Gedling planning application 2026/0549: side and rear external insulationThe proposal retains the front façade and describes extending its brickwork and ornamental detailing to conceal and protect the edge of the new gable insulation.
Gedling Borough Council — Burton Road, CarltonEvidence period: 2026 application record; checked 23 November 2026Source checked: 23 November 2026Gedling planning application 2026/0549: side and rear external insulationSources and further reading
- Approved Document L Volume 1: dwellingsCrown copyright 2021. Approved Document L, Volume 1: Dwellings, 2021 edition incorporating 2023 amendments. Contains public sector information licensed under the Open Government Licence v3.0.Release/version: 2021 edition incorporating 2023 amendmentsSource checked: 23 November 2026
- Approved Document L Volume 1: 2026 editionCrown copyright 2026. Approved Document L, Volume 1: Dwellings, 2026 edition. Contains public sector information licensed under the Open Government Licence v3.0.Release/version: 2026 edition; September 2026 corrected publicationSource checked: 23 November 2026
- Historic England: listed building consentRelease/version: Undated current guidanceSource checked: 23 November 2026
- HSE: arrange an asbestos surveyContains public sector information published by the Health and Safety Executive and licensed under the Open Government Licence v3.0.Release/version: Updated 1 March 2021Source checked: 23 November 2026
- INCA: Best Practice Guide, External Wall Insulation Incorporating RendersRelease/version: Copyright 2024; linked filename V1B 01-10-24; no separate publication date assertedSource checked: 23 November 2026
- INCA: roofline closure systems for EWIRelease/version: Undated current official page; checked23November2026Source checked: 23 November 2026
- External wall insulation: specification for weathering and thermal bridge controlRelease/version: Cover August 2024 update; foreword April 2024 revisionSource checked: 23 November 2026
- Gedling planning application 2026/0549: side and rear external insulationRelease/version: 2026 application record; checked23 November 2026Source checked: 23 November 2026